All articles
OperationsApril 15, 20266 min read

Preventive Maintenance for Electrical Assets: From Reactive to Predictive

Reactive maintenance costs 4–5x more than predictive. The data is in — what stops most plants from making the switch?

Build a tiered program: time-based (oil sampling), condition-based (thermography, partial discharge), and predictive (ML-driven anomaly detection on SCADA streams).

Standardize CMMS work-order taxonomy so every event becomes data. Without clean data, predictive analytics are guesswork.

Aman Tech designs PM programs around your asset criticality matrix — high-criticality transformers get continuous DGA monitoring; low-criticality gear stays on time-based cycles.

preventive maintenancepredictive maintenancethermographypartial dischargeDGA monitoringصيانة وقائيةصيانة تنبؤية

Related articles